| Located in the northwestern part of Shanghai suburb, Anting is a modernized comprehensive industrial base, given priority to the saloon car manufacturing and car-related necessary accessories producing. It is also the most important town of western Shanghai suburb. Facing the Wusong River on the south and meeting the Jiangsu Province on the west border, Anting is situated on the southernmost part of Jiading District, which has a common boundary with Jiading, Kunshan and Qinpu . It is 32 kilometers away from the downtown and 20 kilometers from the Hongqiao Airport. Anting covers 54.75 square kilometers, administering 27 administrative villages and 13 residential committees. The resident population of Anting is 476,000.
Investment environment
(1)Basic establishment
Anting has a sound investment environment which attracting investment from home and abroad. The Nanjing---Shanghai railway Number 312 national highway and Shanghai¡ªNanjing superhighway traverse the town, connecting the criss-cross municipal road within the town and forming a transportation network. The 500,000 voltage electric line connects Anting with East China electricity network and there are two transformer substations( 110,000 voltage and 50,000 voltage) within the town. Anting has well equipped telecommunication facilities, the total capacity of programmed telephone exchange set reaches 30,000. The gas factory of Anting can produce 110,000 stere gas per day, the water factory can provide 80,000 tons of water per day and the sewage disposing factory can handle 50,000 tons of sewage daily.
(2)Volkswagen industrial park To meet the demand of constructing the Shanghai international automobile manufacturing base, the Volkswagen industrial park, which gives priority to the production of automobile spare parts, will be upgraded to city level . The park covers 8 square kilometers in planning and all the basic establishments will be constructed at municipal construction standard so as to create a new image of the park. The supply of electricity, water, drainage, heating power, LPG, telecommunication facilities and the road to the park will be completed . Also the land of park will be leveled soon. |